Give us a call
1-858.454.7326
When Starbucks store 10851 located on Palomar Airport & Loker realized that they needed to update their space they turned to our talented team of professionals. The scope of the project was extensive, including everything from demoing the current layout to adding new furniture, artwork, and lighting. But, with careful planning, attention to detail, and hard work, the project was a resounding success.
The first stage of the project involved demoing the existing front line and back line to clear space for a revamped layout that would accommodate a new front bar equipped with POS systems and horizontal cup holders for added convenience. The team also relocated the safe to a scaled cabinet and added a new Corian countertop and sneeze guards.
The back line also saw a complete renovation, including new tile, cubbies, and menu boards. New track lighting was installed to highlight the new boards, and a Lutron panel was added for better lighting control. The seating and sales area was given a refresh with new furniture, paint, artwork, and lighting. Electrical outlets were added at the community tables for greater convenience, and a new walk-off mat and cafe floor completed the look.
The team also transformed the workroom, adding an employee break table, a large 1500 lb ice machine, and a new chiller. The restrooms received new tiles, lighting, shelves, and hooks.
Finally, the exterior of the store was beautified with new tables and chairs, new umbrellas and bases, and two new logo discs.
With these changes, Starbucks store 10851 was transformed into a modern and welcoming space that customers couldn’t help but love. Sales increased, and the team was thrilled with the results of the project. The hard work, dedication, and vision of the team made this renovation a resounding success for the Starbucks store and its customers.
We have a team of dedicated account managers and technicians that are unmatched in their expertise and professionalism.
CGP is the BOMB!!!
Andrea said it’s SO nice now that the lights are no longer flickering. She mentioned there’s a light completely out outside of their suite in the common area hallway.
CGP Maintenance and Construction always provides quality work and rapid response times.
I just wanted to let you know how much I have appreciated your employee’s through the latest job at La Casa Balboa. The following employee’s have been professional in all the areas of their present assignment here.